Reliez Station Road/Olympic Corridor Study
This study has concluded. Study background and reports are available below. The project is currently under construction. Please monitor HOT TOPICS on the Lafayette Home Page for periodic updates regarding the project.
Presentations & Review:
City Council Review: Monday, May 26, 2015, 7:00 p.m.
Final Report (5/15/15)
Attachment: Existing Conditions Study (10/1/14) (excluding appendices)
Appendix A: On-Line Survey Results
Appendix B: Notes from Community Meeting/Walks
Appendix C: Average Daily Traffic (ADT) Counts
Appendix D: Speed Data
Appendix E: Turning Movement Counts (Current Conditions)
Appendix F: SYNCHRO Analysis (Existing & Future Conditions)
Circulation Commission Review: Monday, May 4, 2015, 7:00 p.m.
Consultant Presentation of Draft Final Report
Community Opinion Survey
Results of the Online Community Survey on solution alternatives, conducted earlier this year, were summarized by the consultant as
part of their briefing at the March 16 Circulation Commission meeting, and were included in their Draft Final Report dated 4-30-15,
presented at the May 4 Circulation Commission meeting.
References and Data
Dowling Associates Memo, May 20, 2005
Circulation Commission Meeting Minutes, June 20, 2005
Pleasant Hill Road Operational Analysis Study, 2001
Traffic Data: Reliez Station Rd/Olympic - Summary Charts of Volume-Speed-Classification Data
Reliez Station Rd/Olympic - Peak Period Ped-Bike Volumes
Reliez Station Rd/Olympic - Peak Period Turning Movement Counts
Reliez Station Rd/Olympic - Volume-Speed-Classification Data