City of Lafayette Standard Specifications
Beginning in September 2013, all City projects shall be done in accordance with the City of Lafayette’s Standard Specifications 2013 edition.
2013 STANDARD SPECIFICATIONS
General Provisions:
Table of Contents
Section 1 Terms, Definitions and Abbreviations
Section 2 Bid Proposal Requirements
Section 3 Award and Execution of Contract
Section 4 Plans and Specifications (General)
Section 5 Control of Work and Materials
Section 6 Legal Relations and Responsibilities
Section 7 Existing Utilities
Section 8 Progress of Work
Section 9 Measurement and Payment
Section 10 Protests and Claims by Contractor
Technical Provisions:
Table of Contents
Section 1 Mobilization
Section 2 Clearing and Grubbing
Section 3 Earthwork
Section 4 Dust Control and Watering
Section 5 Street Failed Area Repair
Section 6 Subgrade Preparation
Section 7 Aggregate Subbase
Section 8 Aggregate Base
Section 9 Asphalt Concrete
Section 10 Bituminous Seal Coats
Section 11 Full-Depth Asphalt Concrete Recycling
Section 12 Asphalt Concrete Leveling Course and Crack Fill Repairs
Section 13 Cold Planing
Section 14 Pavement Reinforcing Fabric
Section 15 Pavement Striping, Markers and Delineation
Section 16 Traffic Signs
Section 17 Concrete Construction
Section 18 Storm Drains
Section 19 Landscape Irrigation
Section 20 Landscaping
Section 21 Tree Trimming and Removal
Section 22 Protection and Restoration of Existing Improvements
Section 23 Other Technical Provisions
Section 24 Directional Drilling